Oceana Marin Treatment and Storage Pond Repair Project
The Oceana Marin Treatment and Storage Pond Repair Project proposes to mitigate the impacts of extreme weather and earthquakes on the Oceana Marin Waste Water Treatment and Storage Ponds that occurred as a result of 2016-2017 heavy rains and wind-generated waves. Emergency pond berm repairs were performed in 2018 as a temporary solution. The current project entails draining the treatment and storage ponds, clearing and grubbing the existing bank vegetation, armoring of the pond berms with stabilization fabric and rock rip rap to provide a long-term solution with a high degree of effectiveness. Project construction is scheduled to begin spring 2023 and be completed by end of summer 2023.