North Marin Water District Logo
  • Contact
  • Español
  • Home
  • Account
    • Online BillPay
    • My Water Usage
    • Update Account Info
    • Start Service
    • Stop Service
    • Rates
    • Low-Income Rate Assistance (LIRA) Program
    • Bill Adjustment Form
    • FAQs
  • Your Water
    • New Water Supplies
    • Novato Water
    • Stafford Lake and Dam
    • West Marin Water
    • Oceana Marin Sewer
    • Water Quality
    • Recycled Water
    • Backflow Prevention
    • Laboratory Services
    • What Is An Acre Foot?
  • Save Water
    • Indoors
    • Outdoors
    • Smart Home Survey
    • Conservation Rebates
    • Business Tips
    • Water Waste Report
    • Drought is Over
  • About
    • About NMWD
    • Board of Directors
    • NMWD Documents
    • History
    • 2019 By-Division Election System
    • 2022 Redistricting
    • Regulations
    • FAQs
  • News
    • News
    • Waterline Newsletter
    • Waterline Newsletter Archives
  • Search

Lynwood Pump Station Replacement Project

PROJECT DESCRIPTION

The purpose of the project is to replace the existing Lynwood pump station (PS) with either one or two new PS at a different location to continue to provide reliable potable water service to the District’s existing customers and to meet demands associated with future growth within the service area. The existing Lynwood PS is in poor condition overall and multiple upgrades would be required to ensure the PS is up to date with latest code, extend its service life, and improve the overall reliability of the facility.

Click here for answers to the project’s most Frequently Asked Questions (FAQ)

PROJECT UPDATES

November 7, 2024 – Discussions with property owners at potential alternative primary pump station sites is progressing slower than anticipated. For this reason, staff is now planning to return to the Board in the first quarter of 2025 with a progress update and recommendations for next steps. Continue to check back to this project website for the most current information.

September 12, 2024 – Staff is continuing discussions with property owners at potential alternative primary pump station sites. For more information on those sites, click here to view Item 12 on the Board agenda from July 16, 2024. Staff is currently planning to return to the Board in November or December 2024 with a progress update and recommendations for next steps. Continue to check back to this project website for the most current information.

July 16, 2024 – Staff provided an information presentation to the Board of Directors at the July 16, 2024 Board meeting. The presentation focused on four (4) additional potential primary sites (sites) for relocation of the Lynwood Pump Station. (Note: On slide 5 of the Presentation, the property ownership for Site 2, Ignacio Blvd, should read City of Novato and not public right-of-way). Staff received Board feedback and public comment, and is now advancing the feasibility analysis of those sites. Staff plans to return to the Board in the coming months with a recommendation to advance the engineering and environmental evaluations of up to two additional sites. Click here here to view the Board agenda, Item 12.

May 7, 2024 – The Board of Directors voted unanimously to amend the District’s consultant contract to assist staff in identifying and evaluating up to two additional primary pump station sites for consideration. The added scope also includes services to advance the architectural component of the project to better understand potential structure aesthetics and surface treatments. Click here to view the Board agenda, Item 8.

May 6, 2024 – The Public Comment Period for the Lynwood Pump Station Replacement Project’s IS/MND closed at 5:00 pm on May 6, 2024.

April 8, 2024 – The North Marin Water District (District) has published a series of answers to the most Frequently Asked Questions (FAQ) received during the CEQA Public Comment Period. The FAQ will continue to be updated as the project progresses. Click here to view the FAQ.

March 20, 2024 – The Board of Directors voted unanimously to postpone the public hearing previously scheduled to take place on April 6, 2024 and authorized staff to seek other primary sites and associated alternatives.  Click here to view the Board agenda, Item 7.

March 12, 2024 – North Marin Water District (District) is extending the CEQA Public Review Period for the Lynwood Pump Station Replacement Project. Comments should be mailed or emailed to the District at the address indicated in the Notice of Availability by no later than 5:00 p.m. on May 6, 2024. The Public Hearing will be rescheduled to a date to be determined, but no sooner than 30 days following the close of the CEQA Public Review Period. Click here to view the revised Notice of Availability.

February 16, 2024 -North Marin Water District (District), acting as the Lead Agency under the California Environmental Quality Act (CEQA), has released for review and comment to all agencies, organizations, and interested persons, a Draft Initial Study/Mitigated Negative Declaration (IS/MND) for the Lynwood Pump Station Replacement Project (project).  For additional information please refer to the following documents listed below.

 

PROJECT DOCUMENTS

Revised Notice of Availability

Notice of Availability

Initial Study/Mitigated Negative Declaration – Without Appendices

Initial Study/Mitigated Negative Declaration – Appendices Only

Engineering Technical Report – Without Appendices

Engineering Technical Report – Appendices Only

Public Meeting Slide Presentation, March 6, 2024

PROJECT IMAGES

Existing Lynwood Pump Station Site

Proposed Pumps Station Site Location Options

Current Projects

In This Section

Crest Pump Station

Lagunitas Bridge Pipeline

Lynwood Pump Station Replacement Project

Novato Boulevard Widening

Oceana Marin

San Mateo Tank Transmission Line

Stafford Dam Adjustable Spillway Gate (ASG)

West Marin System – Future Projects

Other Projects

fb yt insta home-2 tw
  • Business
    • Engineering Services
    • Current Projects
  • Careers
    • Employment Opportunities
    • Human Resources
  • Media & Downloads
    • Press Contacts
    • Brand Files
  • Meetings
    • Agendas & Minutes
    • Calendar

© 2025 North Marin Water District, PO Box 146, Novato, CA 94948-0146

  • Privacy Policy

Site by Kiosk